- (Topic 2)
A team wants to make a schedule for a project showing which tasks must be done sequentially and which may be done simultaneously. Which tool is most appropriate?
Correct Answer:E
- (Topic 1)
An engineer wants to try two hardening ovens to see whether they have different hardness scores. She cuts 8 pieces of bar stock in half, putting half of each in oven A and the other half in oven B. The following data are collected: Do the data indicate that the ovens have different average scores? Assume differences are normally distributed.
Correct Answer:B
- (Topic 2)
An example of a project metric would be:
Correct Answer:D
- (Topic 1)
If the probability that event A occurs is .51, the probability that event B occurs is .64 and events A and B are statistically independent then:
Correct Answer:B
- (Topic 1)
P(A) = .42, P(B) = .58 P(A&B) = .10. Are A and B mutually exclusive (or disjoint)?
Correct Answer:B