Question 46

Upon completion and validation of an improvement to a process a Belt and the Project Team create a Control Plan that contains which of these?

Correct Answer:D

Question 47

Statistical Difference is the magnitude of difference or change required to distinguish between a true difference, brought about by change or improvement, and one that could have occurred by chance.

Correct Answer:A

Question 48

A valuable tool to use during the Measure Phase to show material and information flow throughout an entire process is the ______ .

Correct Answer:A

Question 49

Production Line 1 is able to complete 500 units per shift. Production Line 2 is able to finish 1,500 units per shift. Production Line 2 is 3 times faster than Production Line 1. This analysis is an example of ______ Scale Data.

Correct Answer:B

Question 50

A dock worker for a feed supplier was tasked with assuring the proper weight in the feed bags as they left the dock. One of the columns listed the range of weight of the bags included in the studies. This required plotting a Histogram of the weight of the bags. While drawing the Histogram the x-axis contained a certain scale of data. Pick the scale of data that is appropriate for Histograms.

Correct Answer:B