Following process modifications, the Null Hypothesis states that no improvement to the process has occurred. If we discover the Null Hypothesis Test was rejected when it was false that would be a(n) ______.
Correct Answer:B
To be an effective Lean Six Sigma practitioner one must understand the difference between ______ .
Correct Answer:C
A Lean Six Sigma project is attempting to reduce inventory days. The Process Capability will be monitored as part of the Control Phase to track the sustainability of the improvement.
Which distribution type is best used for performing the Capability Analysis?
Correct Answer:A
Kaizens or Kaikakus and Six Sigma projects are intended to create breakthrough, significant process improvement versus minor, incremental improvements.
Correct Answer:A
Much of the Six Sigma methodology is used to identify and remove causes for ______.
Correct Answer:A