- (Exam Topic 21)
A test management tool is most likely to integrate with which of the following tools?
Correct Answer:D
Requirements management tools (option (D)) often have interfaces with test management tools. In some cases they will be sold as a package or in other cases a test management tool may have its own requirements module. The use of such interfaces or integrated packages aids traceability from requirements through to test scripts and defects.
Performance management tools (option (A)), test data preparation tools (option (B)) and static analysis tools (option (C)) are unlikely to have an interface or be integrated with a test management tool. They serve different purposes and therefore there is little need for such interfaces.
- (Exam Topic 21)
Incorrect form of Logic coverage is:
Correct Answer:B
- (Exam Topic 13)
Comparing TMMi and TPI, which is not a valid reason for choosing either TPI or TMMi? 2 credits
Correct Answer:D
- (Exam Topic 22)
Which of the test cases below will exercise both outcomes from decision 2? [K3] Refer to the exhibit
Correct Answer:B
- (Exam Topic 21)
One Key reason why developers have difficulty testing their own work is:
Correct Answer:C