Free PMI-001 Exam Dumps

Question 86

Which action is included in the Control Costs process?

Correct Answer:D

Question 87

The lowest level normally depicted in a work breakdown structure (VVBS) is called a/an:

Correct Answer:A

Question 88

Which of the following is a tool and technique for activity duration estimating?

Correct Answer:A

Question 89

A tool and technique used during the Perform Qualitative Risk Analysis process is:

Correct Answer:A

Question 90

Which items are an output of the Perform Integrated Change Control process?

Correct Answer:C