Which action is included in the Control Costs process?
Correct Answer:D
The lowest level normally depicted in a work breakdown structure (VVBS) is called a/an:
Correct Answer:A
Which of the following is a tool and technique for activity duration estimating?
Correct Answer:A
A tool and technique used during the Perform Qualitative Risk Analysis process is:
Correct Answer:A
Which items are an output of the Perform Integrated Change Control process?
Correct Answer:C