Through user acceptance testing, a software flaw was identified. What should the business analyst do next as part of the root cause analysis in order to analyze and resolve the discrepancy?
Correct Answer:B
A business analyst has been assigned to a project that will design and build two new bridges and. at the same time, redesign a failing bridge for a local structural engineering company. All three bridges must be constructed and meet all safety requirements before flood season next spring.
How would the business analyst define the scope of this project?
Correct Answer:D
Which document best provides the boundaries for product development?
Correct Answer:A
A business analyst is conducting a cost-benefit analysis of potential solution options. The stakeholders have indicated that the estimated growth rate is very important to them.
Which technique will allow the business analyst to determine this information?
Correct Answer:A
Which of the following is an example of a functional requirement?
Correct Answer:A